Brightline was in the news recently for signing a deal with Miami-Dade County to provide them with the rights to operate a commuter service on the Brightline right-of-way into Miami Centrail Station (source). Would a similar service be provided on the new rail right-of-way between Disney and the Orlando International Airport (MCO)? Or is this a one-off because Miami is such a lucrative market?
Source: Brightline Presentation to CFX on March 11, 2021The benefits of running a train every 15 minutes between MCO and Disney may have a decent case based on potential revenue. Such a service definitely won't collect all the trips that Disney's Magical Express (DME) used to provide, and it certainly wouldn't collect all the trips from Uber or rental cars. But the market for four trains an hour is more than four times the size of the market for one train an hour, simply because the average wait would be so much shorter.
The costs of running trains every 15 minutes are greater than the costs of running a train every hour, as is the current plan for Brightline. But crucially, the extra costs have a smaller cost per train. These costs above the cost of running hourly service include:
- Signals to allow closer train operation
- Trainsets to serve the extra runs
- Fuel to run the trains
- Staff to operate the trains
- Maintenance costs of the trains
Item 1, signaling, is fairly inexpensive. It is even less so especially in a low complexity environment with few stations, junctions, and low intersecting train traffic such as either proposed route. The Brightline presentation to CFX on March 11 indicated that this costs approximately $80,000 with the current design (page 24).
It is not clear what the maximum frequency of service can be supported by this signaling system. But we also
know that Brightline is already planning on this capability because they
are actively courting SunRail to run a service that would need to
utilize these additional signals. Even still, assume that a signaling system necessary to operate trains every 15 minutes is three times as expensive as what they are currently planning to build, that is still only be an extra $160,000.
Item 2, additional trainsets, is difficult to calculate, because Brightline did not release the cost of their train orders from Siemens. However, based on the information I could find online, one might expect a single trainset to cost approximately $10 million. It would take approximately 15 minutes to travel between MCO and Disney Springs, so it would require three trainsets (in addition to the trainsets that provide the baseline hourly service Brightline is currently intending to operate) in order to provide 15 minute headways on this segment. This would mean it would cost approximately $30 million extra to provide this service.
Item 3, fuel costs, can be calculated assuming a fuel efficiency of 1.1mpg (source). Brightline's preferred alternative route is 16.7 miles (source page 24). So six additional one-way train runs is 100.2 miles every hour or 110.2 gallons of diesel per hour. If diesel is $3.75/gallon, that is $6,613.20 per 16 hour day, or $2.4 million per year in additional fuel costs.
Item 4, staff, can be calculated assuming a two person train staff. The 90th percentile salary of a train conductor in Florida is $66,270 (source), while the same for a train engineer is $98,960 (source). If the fully burdened cost of this staff is three times the salary, and there are three shifts of each staff person per train (in order to allow breaks and the like), the total annual labor cost of this service would be $1.5 million.
Item 5, maintenance costs, can be estimated at $4.34 per train mile (source). This works out to be about $2.5 million per year.
In other words, for an initial capital investment of $30.2 million and an additional labor cost of approximately $6.4 million per year, there could be a reliable, congestion-free way to get between the airport and Walt Disney World.
DME used to carry 2.3 million passengers per year (source). So if this train service with 15 minute headways could carry one quarter of the trips that DME used to carry, that would be 575,000 trips per year. Ignoring the capital costs, the break even cost at this ridership level would require a one-way ticket price of $11.13.
Is this a complete no-brainer to build at this break-even point? Not really. But it is well within the realm of having a plausible business case to build. That's for sure.
Guest Satisfaction, Figment, and the Impact of Fastpass on Wait Times
Recently, there has been a discussion about Disney CEO Bob Chapek's recent statement about how average guest satisfaction at Walt Disney World is higher now than in 2019.
"And our Guest satisfaction score since we’ve reopened across the
world have shown that indeed our Guests are even more satisfied than
they were prior to the pandemic." - Disney CEO Bob Chapek
I think most of this increase in average guest satisfaction scores comes from a few big factors:
- Selection effects - the hardcore fans are the people going to the parks currently.
- Capacity restrictions - crowding and long lines have always been the top complaints at theme parks.
- The "real world" sucks right now - compared to the pandemic, any entertainment that helps you forget the problems of real life is going to seem more satisfying than it was in 2019.
- The cuts weren't important to the average guest - many of the eliminated experiences within the parks were
very low capacity, so most guests never experienced them to begin with. For instance, the combined capacity of all character meet and greets in the Magic
Kingdom was probably in the ballpark of the capacity of a single
E-ticket, so cutting a character meet and greet has no impact on most people because they were never a large portion of the experience to the average guest.
Speculation items 1-3 about the increases in guest satisfaction do not necessarily have very much to teach us about how to build or manage a great theme park experience. As soon as tourism picks back up, these effects will vanish. However, contemplating speculation item 4 does have the potential to inform how future investments and operation strategies can be thought of in the world of theme parks. Some of these niche experiences like character meet and greets probably should return, but more thought should be made to determine how important a part of the product they really are.
Is it really worth spending $25 million to build a building for a permanent character meet and greet with a capacity of 200 people per hour? Maybe it is, but that's a lot of money for such a low capacity experience.
But personally, I am hoping that Fastpass (FP) never comes back. It is simply a bad deal for the average guest, for two reasons:
- FP reduces the pace of all lines. Most people would rather walk slowly for 20 minutes in line (like a conventional line) than stand still for most of a 20 minute line (as is common where FP is a part of a ride's queue management).
- FP increases standby wait
times. So where FP is used, the 20 minute standby line is now more like 25 minutes.
How could this be? The theory
is explained here:
Each party has a maximum wait time X under which they would be willing to get in line for each ride. Without FP, a ride with an equilibrium wait time longer than X is a ride that a given party would not ride. If FP is offered, 70% of the ride's capacity is given to people who don't have to wait the equilibrium wait time. Therefore, the number of people willing to ride the ride is greater than it would be without FP, so the equilibrium wait time has to increase due to the number of seats taken by parties who ride despite the fact that the wait time is greater than X.
To illustrate this impact of FP on standby wait times, I will use the example of Journey into Imagination with Figment. FP+ was added to Journey into Imagination with Figment sometime in 2013.
The TEA Theme Index attendance numbers says the attendance at Epcot
was approximately 11.1 million in 2012, prior to any form of FP being
offered at the ride and 11.4 million in 2014, the first full year of
FP+. In a day with average attendance in 2014, there was approximately
31,233 people in the park, 2.6% more than 2012. The attendance
difference works out to an increase of approximately 821 guests per day.
In a given hour, the park's total ride capacity not including shows or movies was approximately 13,500/hour (source). From 2012 to October 2014, park attraction capacity remained the same (Maelstrom closed in October 2014).
Because I had to manually total the hourly average wait times for
Imagination from TouringPlans, I decided to compare the daily average
wait times for a single month in 2012 to 2014. I selected June because
it is a month without a movable major holiday and it only has 30 days.
In June 2012, the average daily wait time for Journey into Imagination with Figment according to TouringPlans was 5.6 minutes. In June 2014, the average daily wait time for the ride was 9.7 minutes. This was an increase of 73%.
TouringPlans did change their methodology of collecting the data between
2012 and 2014. So, I checked June 2013, after the TouringPlans data
format change when I am pretty sure that FP had yet to be installed at
the ride. The TEA Theme Index attendance for Epcot in 2013 was 11.2
million. In June 2013, the average daily wait time for Imagination was 7.9 minutes, making the increase in wait time between 2013 and 2014 to be 24%.
This was a less definitive comparison than I was hoping for. But if this is true, the presence of FP at a ride increases standby wait
times and reduces the pace of all lines. So if
the average guest rides 10 rides a day, FP shortens three lines and
makes the other seven lines longer and slower moving. A day without FP
available is a day where the average guest spends less time in line and where the average guest has a more pleasant wait
because of this effect.
Don't get me wrong, it is really nice to walk on to 7 Dwarfs Mine Train, Frozen, or Flight of Passage. But I know how to use the FP system to the fullest benefit. Remember that a side effect of someone walking on to Frozen is that they ride Frozen more often than they might if they always had to wait in standby line. So there are actually fewer seats available for people who are infrequent visitors.
But also, the seven lines the average guest waits in standby are longer and slower moving than they used to be. Before Journey into Imagination had FP, it's line averaged between 5.6 and 7.9 minutes in June. But with FP--while park attendance only increased about 2.6%--the average wait jumped up to 9.7 minutes in June. Journey into Imagination with Figment is only an okay ride, but worth the occasional visit when it is a walk on. But is it worth waiting 10 minutes for it? That definitely lowers the satisfaction of that part of the day compared to a world without FP.
This principle applies to all the rides and it impacts the average guest more than the repeat guest. That doesn't mean the removal of FP would be a net decline in satisfaction for the smaller class of guests who knows how to get the most of it. But the original claim made by Bob Chapek was about average satisfaction, not satisfaction within all plausible subgroups.
I think it is time to ditch Fastpass. They guests don't know that they want it, but I think they will like visiting the parks more if it was gone for good.
Will Disney Want to Replace Disney's Magical Express Buses with Brightline Trains?
Recently, the intercity passenger railroad company Brightline announced that they made a deal with Disney to have a train station at Disney Springs as a part of their planned Orlando to Tampa route.
| Image source: Brightline presentation at ART Educational Series - Strengthening Central Florida's Global Gateways on 12/3/2020. See a recording of the presentation here. |
Since this announcement, there has been speculation that this would allow Disney to discontinue the bus-based Disney Magical Express (DME) airport transportation service and replace it with a Brightline train service. In many forums, any discussion of this possibility has received push back from people who are concerned about perceived difficulties to riders in navigating such a system, along with questioning the costs to Disney of using such a system.
The concerns about Brightline being less convenient than DME for most domestic arrivals seems overblown to me.
As far as the quality of the passenger experience is concerned, depending on train frequency, there is no particular reason to expect a two seat train + bus ride to take longer than the current one seat bus ride, because the bus portion of the trip would use the existing Disney Springs to hotel buses (potentially at a higher frequency justified by of higher demand). Even without higher frequency bus service, the travel times for a two seat train + bus ride are likely to be shorter than the existing DME service because there would be fewer intermediate stops, higher speeds, and less impact from highway congestion.
What would be the advantage to Disney of a train + bus airport connection? In addition to a higher quality guest experience provided by smoother ride, fewer delays, and more legroom, such a system has the potential to be provided at a lower cost than a bus connection.
How could something this infrastructure-heavy possibly be more cost effective than buses?
Brightline is planning to build this train line to connect Orlando and Tampa via Disney Springs. Their internal studies apparently indicate that there is enough intercity passenger demand to justify creating such a service. In addition, it is my understanding that the new Brightline track is owned by FEC, the Florida East Coast Railroad. FEC is a freight railroad that runs along the east coast of Florida between Jacksonville and Miami.
If Brightline allowed FEC to run freight trains along the right of way between the Florida east coast and Tampa, it would allow them to compete with CSX, the other major freight rail operator in Florida for access to Orlando and Tampa. This freight service alone could go a long way to pay for the infrastructure costs of adding and maintaining this new rail line.
Additionally, the non-Disney Orlando to Tampa passenger travel demand would go a long way to justifying the costs of building this infrastructure.
Therefore, it is extremely likely that in order for Brightline to justify a passenger train service to Disney, they only need to justify the costs of paying for the marginal cost of the train sets and the labor to run the trains between the two stops. These costs could be bundled into a price to charge Disney for offering the service for free to Disney resort guests.
For Disney to save money by switching from Bus to Train transportation between the airport and the resort, I believe that the cost of a train per passenger is likely to be similar to the cost of a bus per passenger. So the main differentiator would be whether Brightline could move more people with fewer employees than Mears, the current operator of the DME buses.
To illustrate how this saves labor, let's imaging a simplified model of the current Bus Only system:
In order to provide a reasonable level of service, each of the Disney Springs to Resort buses (orange in the diagram) operates at a 20 minute headway, requiring 2 buses and 2 bus drivers who can transport up to 50 guests one way in 20 minutes. This creates a maximum capacity of 150 passengers per direction per hour.
Each of the two Airport Bus to Resort routes would operate at a 20 minute headway as well. Each bus requires 1 driver who can transport up to 50 guests one way in 60 minutes. In order to provide a reasonable level of service, the buses operate at a 20 minute headway, meaning that 6 buses and 6 bus drivers are required with a maximum capacity of 150 passengers per direction per hour
In this scenario, there are 24 buses and 24 bus drivers serving all resorts A, B, C, D, E, and F. The passenger travel time from any resort to Disney Springs averages to 30 minutes (including a 10 minute average wait). The passenger travel time to the airport averages 70 minutes (including the 10 minute average wait).
A simplified version of the Train + Bus system would have the following characteristics:
The buses between Disney Springs and all of the resorts have the same characteristics as in the Bus Only system.The Airport Train to Disney Springs would require 1 driver who can transport up to 240 guests one way in 20 minutes. (Note that additional passenger carriages can be added to the train sets to increase capacity without increasing drivers.) In order to provide a reasonable level of service, the trains operate at a 20 minute headway, meaning that 6 trains and 6 drivers are required with a maximum capacity of 720 passengers per direction per hour.
In this scenario, there are 12 buses 6 trains and 18 bus or train drivers serving resorts A, B, C, D, E, and F. The passenger travel time from any resort to Disney Springs averages to 30 minutes (including a 10 minute average wait). The passenger travel time to the airport from any resort averages 60 minutes (including the 10 minute average wait for the train and a 10 minute average wait for the bus).
Note that bus and train schedules could be coordinated to reduce the transfer time to less than 10 minutes if needed, or that additional buses may be run between Disney Springs and each resort if ridership demand is high enough. This would lower wait times for the bus and average travel times as well. So the time savings could be increased by another 5 minutes quite easily.
I would not expect the Brightline express service between the airport and Disney Springs to use advance reservations or advance seat assignments. Instead, I think it is most likely that passengers would select a seat upon arrival at the train station or that the train would not offer assigned seating. In my experience riding trains in Asia, seat selection for a frequent service train line is not generally made in advance.
Guests who chose to bring their baggage on the existing Brightline trains have a baggage parking area in each train car, keeping it comfortably out of the way.
In summary, a two seat ride would reduce labor by 25% and reduce travel time to the airport by 15%. The train portion of the ride would also have less potential for traffic delays and would be a more comfortable ride than the bus.
Factor in the other benefits including increased visitation to Disney Springs and a higher quality experience between the airport and WDW makes Disney's side of the agreement look pretty easy to justify if the price is right.
IAAPA Virtual Education Conference and the Theme Park Metaverse
I recently had the opportunity to attend the 2020 IAAPA Virtual Education Conference. The big news for a general theme park fan from this conference was pretty well covered in the usual places. But there was much more to this conference than Disney showing some footage from their new rides. I have compiled some of the more interesting notes I took from the sessions that I attended.
Over the three-day conference, I saw three “Think Big”-type presentations for the amusement industry: Evolving our Business, Redefining Our Future with Josh D'Amaro (Chairman of Disney Parks, Experiences and Products division), Digital + Physical + Data + Story = Theme Park Metaverse with Tilak Mandadi (Executive Vice President, Digital & Global Chief Technology Officer of Disney Parks, Experiences and Products division), and Changing Attractions Change the World with Andreas Andersen (President and CEO of Liseberg amusement park in Sweden). In my mind, the three presentations all agreed that we should be optimistic of the health of the amusement industry post-pandemic, a position I share. But I also saw a somewhat divergent vision of what the industry will look like in the years ahead with regard to the use of digital technology.
The diverging visions I saw were best exemplified by comparing the content of Tilak Mandadi’s Digital Metaverse presentation with the presentation by Andreas Andersen. Josh D'Amaro’s presentation was a good overview of how Disney parks and resorts sees the current state of their business, but lacked a specific emphasis on the question of the role of technology on the guest experience in an amusement park. However, Tilak Mandadi works under Josh D'Amaro at Disney, so presumably we can look at the two presentations as being a part of the same vision.
Image copyright Disney
Disney’s vision of a Theme Park Metaverse is described as “a shared magical world, created by the convergence of virtually enhanced physical reality and physically persistent virtual space.” This means that the park is connected to the guest’s electronic devices—phones, wearables, etc. to create a “converged experience” with augmented reality, artificial intelligence, and other stuff like that. He then goes on to categorize theme park attraction storytelling as falling into four categories:
- Linear – the image on the screen at this time was of the Enchanted Tiki Room, an attraction that has a linear story only in the sense that it builds to a climax.
- Interactive – the example for this one was Toy Story Midway Mania, which I will grant is a separate type of storytelling from a non-game attraction.
- Immersive – this one was exemplified by Star Wars: Galaxy’s Edge, which although very good, is not very different from the Tiki Room in its storytelling. The rides may have a more linear plot, but the term immersive certainly could be used to describe theme park experiences prior to the Wizarding World of Harry Potter, when this term first became the paradigm of the industry.
- Personalized & Social – meaning that the experience is personalized to the guest and held in a social environment. This was exemplified by concept art for the Star Wars: Galactic Starcruiser resort experience and a demo VR safari experience.
I thought it seemed like this presentation was designed to sell the idea of spending a lot of money on IT in theme parks to investors who don't understand the amusement business, because I didn't find the case to be very compelling at all. Each of the examples given for personalized and social attractions would be extremely low volume.
The Star Wars: Galactic Starcruiser experience is rumored to be a two day cruise-like experience with approximately 150 rooms-worth of guests experiencing a live theater experience over two days. In other words, it has an hourly capacity (at four guests per room over 48 hours) of 12.5 guests per hour. (The famously low-capacity ride Peter Pan’s Flight has a capacity of approximately 800 people per hour.) The Star Wars: Galactic Starcruiser is a boutique experience that will need to be extraordinarily expensive in order to be profitable. I am not saying that it isn’t a worthwhile experience for Disney to attempt to create. But it should not be confused with the business of entertaining 20 million guests a year at the Magic Kingdom. If successful, the Star Wars: Galactic Starcruiser will be a niche product that can be added on to a theme park experience for a small number of guests. But it should not be confused with a theme park experience itself.
Furthermore, the idea of the Theme Park Metaverse begs the question: why will this initiative turn out to be different from Disney Quest or My Magic Plus?
Disney Quest was promised to create personalized, interactive experiences using always updated top-of-the-line technology to tell Disney stories. It sort of worked experientially (although a constant complaint was the extremely slow moving lines caused by the low capacity of all the experiences), but it was so financially unsuccessful that the extra locations were cancelled and the original location had almost no updates for 20 years until Disney found a new tenant for the space at the lone-surviving location in Orlando.
My Magic Plus was supposed to do everything that the Theme Park Metaverse tries to do, but it went way over budget and many of the storytelling initiatives were scrapped after the early pilots were underwhelming. The lesson I take away from this is that Disney’s IT-based initiatives are prone to go over budget and under deliver. If My Magic Plus cost two billion dollars to build (as it was rumored to cost), wouldn’t Disney be more profitable today if they built two additional Star Wars: Galaxy’s Edge-caliber expansions for the same cost?
But the biggest problem I foresee with the Theme Park Metaverse is that it will be likely to have a learning curve. Going to a Disney theme park for the first time is intimidating. New guests arrive knowing that they will be spending a lot of money, but they don’t necessarily know where or when. I can’t tell you how many times a guest would come up to me when I was a ride operator and ask me how much Fastpass cost. I would explain to them how the system works, and inevitably they would get excited before I had to tell them that all the Fastpasses for the ride had been distributed for the day. It took minutes to explain, and so many parts of the theme park experience are that complicated while also being invisible. Did those guests figure out Fastpass after I explained it and become customers for life, or did that add up to a long list of frustrations that made the guest vow to never return?
Gone are the days where eating at a table-service restaurant at Disney works like eating at a table service restaurant in the real world. Gone are the days where a guest can look at the number of people standing in line and decide whether they want to see something called Space Mountain (whatever that is) after all those people in line ride it first.
Instead there are complicated systems. Systems that benefit people who know how they work at the expense of first time guests. Does Disney get repeat visits from first time guests as much as they used to? I don’t know. But I do know that a confused and frustrated guest is not a happy guest.
The closing keynote presentation was by Andreas Andersen, the head of Liseberg. This presentation was about how global changes should be addressed by the amusement park industry. In a lot of ways, I saw this presentation as a rebuttal to the Disney presentation. He said that although we should utilize technology when it is the best tool, we should not bend over backwards to become secondary to the digital world. He said that a key opportunity for amusement parks going forward is that they bring people together in person—the amusement industry is about face to face connections and interactions and about shared experiences.
So perhaps we want to use digital technology to tell stories, engage in financial transactions, and other things like that. But we can’t lose sight on the fact that the strategic advantage amusement parks have is that they can be an escape from digital interaction. Theme parks should not have such a steep learning curve that they don’t generate new customers.
I think Andersen’s presentation was a lot better placing technology in the overall context of how it fits in the total park experience, understanding that guests have a lot of demands of their time, and that complications are a serious turn off to engaging new customers.
I don’t want to make it sound like this presentation was a point-by-point refutation of the Disney presentation, because it wasn’t. But I really think that it was a perspective that comes from an understanding that theme parks are not technology companies. They are their own thing. They should take the best tools from other industries and use them when they make sense.
The Metaverse presentation concluded with a section about the new Genie itinerary planning tool system, which sounds to me like an official version of the tools provided through the Touring Plans family of tools. Setting aside any questions of efficacy, I see this platform as reducing some of the complexities of planning a trip to a Disney resort. However, questions of adequate capacity and legibility of the systems to a first time guest is definitely up in the air. If these problems can be overcome (I am not sure that these problems are mathematically solvable in a high-volume business like Disney theme parks. But assuming it is), this is the part of the presentation where I think Disney’s vision has common ground with that of Andreas Andersen. All presentations agreed that waiting in line and overcrowding are real detriments to the experience of visiting a theme park. And there is a multitude of ways to reduce these friction points. But it is always important to see the problems from the perspectives of all of the different kinds of guests.
The skiing industry has a problem where the number of newcomers to the
sport is less than the number of people who age out of it. This is widely
believed to come from the high cost of single day lift tickets, the steep
learning curve of the sport in general, and decades-long focus on large
ski-operators in building real estate developments at the expense of the
mountain experience. I believe that the amusement industry needs to be weary of
these dangers. It is important to be profitable in the short term, but it is
not healthy to do so at the expense of the long term prospects of the industry. So exploit your real estate holdings, invest in technology, and try to invent new things. But don't lose sight that a guest visiting for the first time might be your next repeat customer. That is, if they can figure out how any of this stuff works.
If you attended the conference, but haven’t yet had an opportunity to see all the sessions you wanted to, I have included a short list of the other sessions that I saw and would recommend.
- Creating Retail Experiences that Extend the Guest Experience
- Creating Worlds: Writing and Installing Audience Driven Immersive Entertainment
- Documentation Best Practices for Ride Operations
- Fix It When It's Broken: Is Your Entertainment Center Under Performing? Fix It with Five Proven Solutions!
- Food and Beverage Infrastructure and Restaurant Design
- Human Factors and Attractions
- Voice of the Visitor: Learn Guests Opinions,
Attitudes, and Expectations
If you have any sessions to recommend to me, let me know. I would be happy to hear about them!
Disclaimer: If you disagree with anything I wrote, let me know why. I could be convinced that my opinion is incorrect with a good argument. I have no connection to Disney or any other organization discussed above. The opinions expressed are possibly my own, but definitely not my employer's or anyone else's. And I like the organizations I discussed above. So nothing should be interpreted as a criticism of any individual or organization. This post was simply my thoughts upon seeing the presentation.
The Monorail Project - Phasing
The Monorail Project–Build Out Monorail Ridership Daily Trip Distribution
I have calculated the estimated demand for every hour of each segment of my preferred alternative monorail networks. However, to understand what they mean, it is important to understand how many people an hour a monorail can realistically carry.
The design capacity of any grade-separated transit line is determined by several factors:
- total passengers per car
- number of cars per train
- headway (the time between train departures), which is the sum of:
- minimum train separation in seconds
- dwell time at station
Likewise, the Contemporary Resort also forms the overall maximum length of trains. Currently, the monorail station is the northern half of the building. But it is conceivable that the monorail station platform could be extended to run the length of the building (approximately 430 feet). If the monorail cars remain the same dimensions as they are currently, this creates a maximum train length of 13 cars.
Unfortunately, determining the headway of the monorail requires more than some simple extrapolations of the current monorail system.
From the beginning, I have been assuming that the monorail trains and stations would need to be reconfigured to allow for platform-level boarding. Platform level boarding is when the station platform is level with the floor of the train so passengers in wheelchairs can board without the use of a ramp. This eliminates the requirement for a cast member to be present at all stations to operate the ramp, and can dramatically reduce the required station dwell time.
I also assume that all the bugs in the automatic train control can be worked out to allow for the most efficient train spacing.
Because both of these characteristics are not present in the existing monorail system, I have to look to other transit systems to identify a realistic headway time.
Some metro systems have been known to operate with headways of as little as 70 seconds, but that is on metro systems that primarily serve commuters, people most likely to know where they are going and how things work. Perhaps a better comparison might be airport people movers such as the ones at the Orlando International Airport. An airport people mover's load and unload characteristics are similar to the monorail because they have platform level boarding, automated train control, and platform doors. Airport people movers are not as familiar to riders as urban metro systems, because they are not a part of the daily commute for most passengers. Additionally, the riders of such systems frequently have rolling suitcases which may take up space during passenger flows through doorways in a fashion similar to strollers upon exit and entry of the monorail at Walt Disney World.
An airport people mover system can have headways as fast as 90 seconds, but according to the Transportation Research Board's Transit Capacity and Quality of Service Manual, a more typical headway for such a system is 120 seconds.
Once the design capacity was determined using the numbers above, I calculated the achievable capacity. This is the capacity that a transit line can be reasonably assumed to achieve given the variability in demand across an operating hour. The Transit Capacity and Quality of Service Manual recommends a peak hour factor of 0.8 to be used. This means that if the design capacity for a specific segment is 1,000 people in an hour, it should be assumed that only 800 people in an hour will actually be carried before unacceptable train loads or queuing would be experienced.
Monorail Achievable Capacity for Two Minute Headway Operation by Train Length
Cars Per Train | 6 (Existing) | 7 | 8 | 9 | 10 | 11 | 12 | 13 |
Train Capacity | 360 | 420 | 480 | 540 | 600 | 660 | 720 | 780 |
Achievable Train Capacity (Peak Hour Factor of 0.8) | 288 | 336 | 384 | 432 | 480 | 528 | 576 | 624 |
Design Capacity (people per hour) | 10,800 | 12,600 | 14,400 | 16,200 | 18,000 | 19,800 | 21,600 | 23,400 |
Achievable Capacity (people per hour) | 8,640 | 10,080 | 11,520 | 12,960 | 14,400 | 15,840 | 17,280 | 18,720 |
Now that these capacities have been determined, we can look at the estimated hourly capacities of each network to determine what each network would look like (and whether it would even work at all).
When I first calculated these numbers, I wanted to create some GIFs that would show the estimated ridership on each segment for each hour of the day. Unfortunately, after spending my free time on this task for the last several months (I determined the ridership numbers in February 2017), I have come to the conclusion that either Data Driven Graphics in Photoshop defy logic or (more likely) that I bit off more than I could chew. So, I will instead present some charts showing the maximum hourly demand for each line and maps showing the peak hour passenger flows for each network. If anyone out there knows anything about Data Driven Graphics in Photoshop and wants to help, feel free to comment on this post. Because I still think it would be a helpful way to visualize the passenger flows on each network.
Network 1094 Characteristics
Line | Max. Hourly Passengers | Peak Hour | Peak Segment | Cars Per Train | Headway (minutes) | Cycle Time (minutes) | Trains Required |
Park Connector B | 22,139 | 10:00AM – 11:00AM | Hollywood Studios - Epcot | 13 | 1.7 | 34.7 | 21 |
Existing Resort | 2,163 | 10:00AM – 11:00AM | Grand Floridian - Magic Kingdom | 13 | 8.0 | 15.9 | 2 |
Epcot Loop B | 3,378 | 10:00AM – 11:00AM | Port Orleans French Quarter - Epcot | 13 | 9.9 | 9.9 | 1 |
Epcot Loop E | 8,193 | 10:00AM – 11:00AM | Saratoga Springs - Disney Springs West Side | 13 | 4.0 | 31.9 | 8 |
Studios Loop A | 4,559 | 10:00AM – 11:00AM | Boardwalk - Hollywood Studios | 13 | 5.3 | 15.9 | 3 |
Animal Kingdom Loop A | 6,392 | 10:00AM – 11:00AM | All Star - Animal Kingdom | 13 | 4.7 | 14.1 | 3 |
The monorail network with the highest score per mile, Network 1094, has one link with a passenger demand greater than the maximum achievable capacity of a monorail at Disney World given my original constraints. This link, connecting Hollywood Studios to Epcot, would require the longest trains possible to operate at headways of only 1.7 minutes. Unfortunately, this would not be possible to achieve on a consistent basis, so this network must be rejected.
Before we completely reject this network, I do want to discuss a possible confounding factor that may make this a more feasible option. When I started working on this project four years ago, there wasn’t even the slightest hint that the Skyliner gondola transit system would be built connecting Hollywood Studios to Epcot. It remains to be seen exactly how this system will operate and how it would be integrated with any monorail network expansion. But this gondola transit system is being built in the area where my network model suggests there would be the greatest demand. So potentially a network like this may still have a chance of being technically possible.
Network 838 Characteristics
Line | Max. Hourly Passengers | Peak Hour | Peak Segment | Cars Per Train | Headway (minutes) | Cycle Time (minutes) | Trains Required |
Park Connector B | 16,775 | 10:00AM – 11:00AM | Hollywood Studios - Epcot | 13 | 2.2 | 34.7 | 16 |
Existing Resort | 1.391 | 10:00AM – 11:00AM | Grand Floridian - Magic Kingdom | 13 | 15.9 | 15.9 | 1 |
Epcot Loop B | 2,580 | 10:00AM – 11:00AM | Old Key West - Epcot | 13 | 7.8 | 15.5 | 2 |
Studios Loop A | 2,701 | 10:00AM – 11:00AM | Yacht & Beach Club – International Gateway | 13 | 8.0 | 15.9 | 2 |
Animal Kingdom Loop A | 3,912 | 10:00AM – 11:00AM | All Star – Animal Kingdom | 13 | 7.0 | 14.1 | 2 |
This network would call for 13 car trains that would arrive on 2.2 minute headways for the Park Connector B line. To provide operational flexibility, I assume that the 13 car trains would be used on the other lines, even though they could achieve an acceptable capacity with shorter trains. The table above indicates that the Epcot Loop C, Studios Loop A, and Animal Kingdom Loop A lines could have headways of approximately 7 or 8 minutes, so riders would have an average wait time of 3 or 4 minutes, comparable to the Existing Resort line and much better than the average headways on many major city’s rapid transit lines.
The Existing Resort line, however, would be able to operate with a single train and would have a headway of almost 16 minutes. I would consider this unacceptable, and although enough capacity could be provided with a single train, I think two trains would be necessary to maintain service quality and keep wait times within the limits described at the onset of this project.
Network 1112 Characteristics
Line | Max. Hourly Passengers | Peak Hour | Peak Segment | Cars Per Train | Headway (minutes) | Cycle Time (minutes) | Trains Required |
Park Connector B | 34,520 | 11:00AM - 12:00PM | Hollywood Studios - Epcot | 13 | 1.1 | 34.7 | 33 |
Existing Resort | 3,619 | 11:00AM – 12:00PM | Grand Floridian - Magic Kingdom | 13 | 8.0 | 15.9 | 2 |
Epcot Loop B | 5,080 | 11:00AM - 12:00PM | Port Orleans French Quarter - Epcot | 13 | 4.9 | 9.9 | 2 |
Epcot Loop E | 14,905 | 3:00PM - 4:00PM | Disney Springs West Side - Typhoon Lagoon | 13 | 2.5 | 31.9 | 13 |
Studios Loop A | 6,840 | 11:00AM – 12:00PM | Boardwalk – Hollywood Studios | 13 | 3.8 | 11.3 | 3 |
Sports Loop A | 11,597 | 11:00AM - 12:00PM | Art of Animation - Hollywood Studios | 13 | 2.6 | 12.8 | 5 |
Animal Kingdom Loop A | 9,611 | 11:00AM - 12:00PM | All Star – Animal Kingdom | 13 | 3.5 | 14.1 | 4 |
Network 1112 was investigated because it was the highest ranked alternative to have a station at the ESPN Wide World of Sports. This network would carry a whopping 329,000 riders per day and would be the 6th busiest rapid transit system in the United States (behind San Francisco’s BART system which moves 35% more people on 140% more track (source)). However, this network would most definitely not work. At the peak hour in the morning with 13 car trains, the Park Connector B would need to operate at a headway of only 1.1 minute. My research suggests that some rapid transit systems in Eastern Europe may be able to operate at nearly that frequency, but the train doors open before the trains come to a complete stop, the riders are generally commuters who know where they are going and don’t have strollers, the weather is colder so people get out of their seats faster, and the liability and insurance requirements work very differently there than in the United States. In short, this network could not work. Not even the Skyliner gondola system can save it.
To make this system work, I would need to connect the Animal Kingdom side of the Park Connector B to Magic Kingdom and make two separate Park Connector lines running in loops in opposite directions. Maybe one day I will sketch out what that could look like. But for now, pretend this network doesn’t exist and we can move on to discuss something that could work.
Network 453 Characteristics
Line | Max. Hourly Passengers | Peak Hour | Peak Segment | Cars Per Train | Headway (minutes) | Cycle Time (minutes) | Trains Required |
Park Connector A | 10,382 | 10:00AM - 11:00AM | Epcot – Hollywood Studios | 8 | 2.1 | 40.6 | 19 |
Existing Resort | 2,163 | 10:00AM - 11:00AM | Grand Floridian - Magic Kingdom | 8 | 8.0 | 15.9 | 2 |
Epcot Loop B | 3,378 | 10:00AM - 11:00AM | Port Orleans French Quarter - Epcot | 8 | 4.9 | 9.9 | 2 |
Epcot Loop E | 5,626 | 10:00AM - 11:00AM | Saratoga Springs - Disney Springs West Side | 8 | 4.0 | 31.9 | 8 |
Studios Loop A | 4,559 | 10:00AM - 11:00AM | Boardwalk – Hollywood Studios | 8 | 4.0 | 15.9 | 4 |
Network 453 was selected because at 23rd, it was the highest ranked alternative to use Park Connector A. This network would be able to operate eight car trains with a 2.1 minute headway on the Park Connector A line and headways of between four and five minutes on all of the resort loops except for the existing Resort Line. The existing Resort Line would be able to operate with only two trains, but the headway would be eight minutes, and would probably be noticeably longer than the waits on the other lines. So, because I can make up whatever I want to, I would recommend having three trains operating on the existing Resort Line so the headways would be in the neighborhood of five minutes like the other resort loops.
This network would carry 178,000 people per day and would be the 9th busiest rapid transit system in the United States (source). The eight-car trains in this network would dramatically reduce the amount that the existing stations would need to be modified, and in most cases would not even require a replacement of any existing track in station areas.
This transit system would require an additional 22 miles of track to build, 36 new eight car trains, 17 new stations and major reconstruction of all the existing stations. This system or any other system expansion described in these posts would optimistically cost hundreds of millions of dollars, and at the end of the day would only increase Disney’s bottom line by the amount that a premium could be charged to the hotel rooms that would be gaining monorail service access. As a fan of the Walt Disney World Monorails and theme parks in general, I am not sure whether I would want Disney to spend that kind of money on something like this instead of, say, a major expansion of an existing theme park.
The construction of such a system would cause major disruption to the existing monorail lines. And once it is built, a minor mechanical problem on a single train would cause incredible disruption resort-wide.
On the other hand, it would be separate guests traveling between parks and hotels from the growing surface traffic congestion across the resort. Wider roads and new bridges aren’t cheap either. Potentially, a monorail expansion could be taken on by the Reedy Creek Improvement District to take advantage of its ability to utilize tax free municipal bonds like what was done with the Disney Springs parking garages.
I am working with a friend who has done some cost estimation for large scale transportation projects so we can try to put together an order of magnitude cost estimate for one of these networks.
If you have any feedback or questions about my methodologies here, please feel free to comment on this post.
About the author: Ben Lytle is an AICP Certified Urban Planner living in Orlando, Florida. He is currently working at AECOM on the architectural facility design of a major theme park attraction in Central Florida and previously worked on the preliminary ground transportation infrastructure design for a theme park resort in Asia. The views expressed in this blog do not represent those of his employer, his employer’s clients, Walt Disney World, or potentially even his own. The information contained in this post is purely speculative and is derived from publicly available information as described elsewhere in this blog. The author does not make any claims to the accuracy of any information presented here. It has not been verified by anybody, and should not be taken any more seriously than any other Armchair Imagineering you read online. So there.
2025 China-Japan Trip Part 6: Beijing to Tokyo and Shop at Ikspiari
Part six of my 2025 China Japan trip report. October 20: Fly to Tokyo and Shop at Ikspiari After the long day at Universal Studios Beijing...
-
Every year, I like to put together a list of all the movies I saw in the previous year. A small number of movies on the 2018 list were relea...
-
Orange County, FL is currently in the process of reformulating it's zoning code. It is following in the footsteps of cities like Miami a...
-
With the Skyliner gondola transit system announced to connect Hollywood Studios, Epcot, and some nearby resorts, I figured it is time to do...